Abm Procedure

Let's Start Together

Advise & Assist

ABM team will Advise and assist in selecting your new home plans. We will understand the individual requirements and upgrades  Our valued clients are required to provide the details of land contract, plan of subdivision, estate design covenants and proof of ownership of the Land. You will be required to provide the pre-approval of finance from your landing institute for house construction.

Draft and Design

We will order soil test, property information. Our experienced Architect will provide sketched plans showing your changes (if any), developer approval, working drawings, electrical plan etc and prepare final fixed price with your upgrades (if any).
We will make an appointment for color/product selection.

Once the plan is finalised. Both parties are required to Sign off on plans, costings & drawings to ensure all your requirements, changes, options are reflected accurately.

Colour and Product Selection

Our expert consultant will help you to select the right product and colour schemes for your dream home. This face-to-face meeting will take approximately 2 to3 hours. This will ensure that you are informed about each product and colour scheme that will be used for your sweet home.

Contract

ABM homes will present to you three copies of the building contract. ABM homes will retain one signed copy of the contract. One copy of contract will be for your records, and one to present to your finance lender. We will go through the building process with you and answer any questions you might have. You will need to sign contracts and pay balance of 5% deposit (less any initial deposit).Once the contract is signed, no more structural, colour or any other changes can be made.

Building Permit & Permissions

ABM homes will proceed with obtaining building permit for your Dream home. Our customer service manager will write to you advising you of construction start date. Our valued client will require to provide  us unconditional finance approval to commence the work.

Construction Stages

Base stage:

This stage is when the sewer drains, termite protection Part A (where applicable), Underground electrical cable run in, and concrete slab has been completed.

Frame stage:

The stage when a home’s frame, garage and trusses (excluding veranda if applicable) is completed and approved by a building supervisor.

Lock up stage:

The stage when a home’s brickwork, windows, roof covering, and plumbing rough in are completed (excluding external doors)

Fixing stage:

The stage when all internal cladding, infills, architraves, skirting, doors, baths, (excluding spa baths) metal trough cabinet, cabinetry of a home are fitted and fixed in position.

Completion:

This stage is when all painting, floor coverings, plumbing fixtures (including tapware, basins, and sinks) appliances, electrical fit off, heating and cooling (where applicable), hot water service, water tank (where applicable), ceiling insulation and caulking works have been completed.

After Construction:

Client will contact ABM Homes to arrange inspection of your home after 3 months if needed.